Case Study: Airbus

BROUGHTON BELUGA LINE STATION

CLIENT: AIRBUS
LOCATION: BROUGHTON
VALUE: £156,000.00

COMPLETED: July 2015

DESCRIPTION OF WORKS

New Beluga wing loading hanger where Bmech were awarded the contract to carry out the full mechanical installation, testing and commissioning of Incoming Gas & Mains Cold water, 3” welded high level gas main, LPHW systems including the high level radiant panel installation, Air Source Heat Pump installation, Welfare block DWS & LPHW installation, Above ground drainage.

POINTS OF INTEREST

LTHW radiant heating system installed at a height of 23M, extremely tight timescale and working to Airbus installation and safety standards.

Organisations we
have worked with.

DO YOU HAVE A PROJECT WE CAN HELP WITH?

Put it in the hands of the experts at Bmech,
contact us today to speak to one of our experienced team.

Accreditations
TOP